Project Details
Our team completed the base, asphalt, curb and gutter, ADA ramps, and sidewalks on a new phase of this residential subdivision. The phase included four separate, non-contiguous streets, three different types of curb, and one section of alleyways with an inverted street profile.
A project like this demands cohesive field crews and strong oversight to execute each scope of work on time and to meet or exceed local minimum street standards. We worked alongside the city inspector, the engineer of record field observation staff, and the third party testing company to make sure every step was inspected and completed per design.